• IMG 6018 01homepage
  • 170928 421
  • IMG 6135hp
  • NissanHP
  • LevittPavHomePage
  • Washingtonelementary2
  • HanoverTownshipHomePage
  • American-Bank-1
  • LVH Emergency
  • Allentown Parking Authority | Community Parking Deck | Allentown PA
  • Catasauqua Municipal Building | Catasauqua PA
  • Hazleton Honda Dealership | Hazleton PA
  • Hazleton Nissan Dealership | Hazleton PA
  • Levitt Pavilion SteelStacks | Bethlehem PA
  • Bangor Area School District | Washington Elementary School | Bangor PA
  • Hanover Township Administration & Public Works Facility | Allentown PA
  • Jaindl Building | American Bank | Allentown PA
  • Lehigh Valley Hospital | Emergency Department Addition | Allentown PA

LCCCBerrier1Lehigh Carbon Community College

Berrier Hall Addition & Renovations | Schnecksville, PA

The $5,000,000 Berrier Hall Addition & Renovation project consisted of the construction of a multi level, multi phased renovation and addition. In total, approximately 57,000 s.f. of floor space was renovated. Also, a new glass curtain wall addition was added to the south elevation, to create space for a fitness mezzanine and cardio equipment. 

  

The existing partitions were demolished, creating space for new offices, locker rooms, training rooms, dance studio, and auxiliary gymnasium. Renovations to the existing gymnasium consists of painting, and new wood bleachers.

The work required for the exterior of the building included the painting of the existing metal fascia & siding, new entrance doors and vestibules. Also, Extensive electrical and HVAC work was required as part of the renovation.
Bracy Contracting Inc., acting as the project Construction Manager , worked closely with Lehigh Carbon Community College and MKSD Architects, to obtain competitive public sector bids, explore construction alternatives, and offer numerous value engineering items. This pre construction management resulted in both cost and time saving for Lehigh Carbon Community College.

LCCCBerrier2